NEW CONSTRUCTION Pre-Selling Final Triplex Release Est. Completion Winter 2024/2025. Light & Bright w/10′ ceilings on main level featuring open living/kitchen area & powder w/durable Artisan Select flooring. 9′ ceilings on upper level w/two en-suite bedrooms/baths & laundry. Under-mount sinks, quartz counters, Delta faucets. Stainless steel appliances include gas range, D/W & microwave. Finished lower level includes Bed #3, Rec Room & 3/4 Bath. Smart thermostat & A/C included. Detached, single-car garage w/private enclosed rear patio. Unit C faces north and is an end unit that abuts a landscaped out lot with grass/trees. Pre-Selling Final Triplex Units. Projected completion 10 to 12 months from construction start . Built by long time local builder. All homes to be Energy Star certified.